  • TSB: Technické sítě Brno, a.s.
    garlands complete the festive atmosphere of the city centre Traditional billboards are situated in the light garlands it is possible to book them with our company The festive lighting of several sights was reconstructed recently e g Cathedral of St Peter and Paul St Thomas s Church St James s Church Red Church Husovice Church Basilica of the Assumption of Our Lady at Mendel Square Church of the Holy Cross

    Original URL path: http://www.tsb.cz/?akce=festive-lighting (2016-04-30)
    Open archived version from archive


  • TSB: Technické sítě Brno, a.s.
    for street lighting and festive lighting is ca 16GWh per year The average input power under 100 W light point in our case 95 W per 1 light point rates City of Brno among the most saving cities within the Czech Republic The average rate of non lighting in the City of Brno was in the year 2011 ca 0 4 per cent which is also above standards in some other comparable cities was the rate of non lighting between 3 and 4 per cents The street lighting operation time is 4 084 hours per year the total energy consumption ca 16GWh per year average input power 95 W per 1 light point At present our company prepares the reconstruction of the oldest parts of City of Brno street lighting the exchynge of poles and cabli In 2011 the measurement of corrosion and static stability of poles and pylons was performed within the regular maintenance of street lighting by means of the Roch method According to these measurements and as a result of insured events there were 117 street lighting poles exchanged During the regular maintenance of street lighting also 7 167 light sources discharge lamps were exchanged to reach

    Original URL path: http://www.tsb.cz/?akce=operation-and-maintenance (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    their own lanterns On November 1 1781 there were 277 tallow lamps erected in the streets of Brno The street lighting was only in the inner city outside the city walls there were no lamps The tallow lamps were then in 1841 replaced by oil lamps The year 1846 represented a new epoch in the lighting of Brno streets and squares In this year the Company for gas lighting was established and the city council made a contract with this company concerning the street lighting The following negotiations took some time and gas lighting started on January 1 1849 Brno suburbs had their gas lighting since 1860 Until then the oil was used for street lighting and some suburbs had no lighting at all On December 30 1896 the City of Brno took possesion of the gasworks and thus also the street lighting 1870 gas lamps and 13 paraffin lamps were in streets those days Since 1897 the Auer burners were used which increased the luminous intensity and at the same time saved the gas consumption In the Brno street lighting history the year 1901 is important in this year first six electric lamps were erected in Great Square today s Freedom Square There had been two electric arc lamps in front of City Theatre even two years earlier but those were switched off after the theatre performance In 1902 two new electric arc lamps were built in the Railway Station Square In that year 12 electric arc lamps 2148 gas lamps and 44 paraffin lamps were in streets of Brno In 1914 the City Council approved the electric lighting of certain parts of the city However the WWI thwarted those plans During war years the gas production dropped down because of shortage of coal and the gas lighting was

    Original URL path: http://www.tsb.cz/?akce=street-lighting-history (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    begins in 1973 In this year the concept of communications reconstruction and subsequent renovation of underground utilities was prepared The first master plan of Brno collector network was created during commencement of building of first section Dornych Křenová Street The construction then proceeded by prolonging of this first section in the direction Radlas Svitavské nábřeží and Tkalcovská and Tatranská Streets In 1978 was this collector network master plan revised with the aim to create two collector circuits One of them around the historical inner city and the other in the area of industrial estates next to the city centre Following the reconstruction of communications on the surface also the construction of collectors in sections Jugoslávská Street Cejl Malinovského Square and Hybešova Street proceeded Those sections were part of the circuit around the industrial estates Their construction was finished in 1994 which meant the end of the first phase of primary collectors building The construction of the circuit around the historical inner city in sections Mendlovo Square castle Špilberk Moravské Square and Koliště has never been commenced and with respect to the development of collector construction concept will be probably never realized Current requirements on the collector constructions prefer secondary collectors

    Original URL path: http://www.tsb.cz/?akce=collectors-history (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    are serving both for access and also for placing of networks and technologies Linear utilities of transit mains and technical networks for longer distances are placed in the primary collector The dimensions for main primary collectors are nowadays circular profile with diameter of 5 10 metres with flat bottom of clear height 4 0 metres Secondary collectors The tunnelled secondary collectors are unlike the primary collectors considered to be a

    Original URL path: http://www.tsb.cz/?akce=types-of-collectors (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    collectors excursion There are two guided routes available On the first guided route the visitor will be informed about the construction and operation of modern collector structures This first route is ca 500m long and the duartion of the guided tour is ca 60 minutes On the second guided route the visitor will be informed about the construction and operation of modern collector structures plus about some interesting facts concerning historical technical structures in the city of Brno like wells fountains or historical aqueducts The second route is ca 1200m long and the duartion of the guided tour is ca 90 minutes Maximum number of persons in group is 10 Visitors are obliged to get acquainted with operation rules and regulations concerning underground premises prior to ordering the tickets For details see www ticbrno cz Times of guided tours to collectors Every Tuesday 3 PM first route 4 15 PM second route Every first Saturday in month 10AM first route 11 15AM second route Admission fee First route 100 CZK person Second route 120 CZK person Warning We are sorry but entry is not allowed for handicapped persons with limited mobility cardiacs with artificial pacemaker disabled card holders and children

    Original URL path: http://www.tsb.cz/?akce=public-excursions (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    server room and data storage of the Metropolitan network of City of Brno The City informatics department of the Brno City Municipality Office is the user of this data centre This data centre belongs to the largest in the Czech Republic according to its parameters Its capacity is designed sufficiently for storing of IT technology The data centre is designed and built to resist even 1000 year flood The data

    Original URL path: http://www.tsb.cz/?akce=data-centre (2016-04-30)
    Open archived version from archive

  • TSB: Technické sítě Brno, a.s.
    OUTDOOR ADVERTISING NETWORKS Data centre Data network servicing INVESTMENTS ESTATES Data network servicing Technické sítě Brno a s provides complete servicing of a significant part of the Metropolitan network of City of Brno for statutory City of Brno This servicing consists of maintenance and securing of permanent operability administration and technical supervising of data network The servicing does not apply only to fibre optic lines and active elements but also

    Original URL path: http://www.tsb.cz/?akce=data-network-servicing (2016-04-30)
    Open archived version from archive