  • 2012 - tunnel Blanka | ULMA Construcción CZ s.r.o.
    tunnel OSEK 2009 tunnels Dobrovského 2007 subway Benešov 2004 subway Chrastava 2004 tunnel Panenská 2003 tunnel Kobylisy 2003 tunnel Mrázovka TP3 2002 Mrázovka Special Constructions Scaffolding Trench Shoring Systems Other Service Company ULMA CZ Profile History ULMA Construcción SP ALPI s p a IT Contacts Ulma Construcción CZ Contacts ULMA Contrucción worldwide Demand form Home Reference Projects Tunnels 2012 tunnel Blanka 2012 tunnel Blanka Project name Set of structures M circuit Praha construction no 0079 Špejchar Pecl Tyrolka 0080 Prašný most Špejchar Execution period 2012 Main contractor Contractor HOCHTIEF CZ a s Utilized ULMA products MECCANO and OMEGA unilateral supports Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel 421 249 102 911 13 E mail info ulmaconstruction sk Branch Office Brno Kulkova 10 615 00 Brno Tel 517 543 411 Fax 517 543 412 e mail info ulma c cz Pobočka Žilina Štrková 10 010 01 Žilina Tel 421 911 721 141 E mail mryba ulmaconstruction sk Branch Office Ostrava U Řeky 594 720 00 Ostrava Hrabová Tel 596 531 252 Fax 596 531 252 e mail info ulma c cz Sklad Plzeň Bezovka 351 Areál Manto 330 03 Chrást u Plzně Tel 702 006 019 773 576 507 E mail info ulmaconstruction cz Home Systems and Products Wall Formworks Column Formworks Slab Formworks Propping and Shoring Systems Support Systems Special Support and Formwork System Complementary Items for Formworks Scaffolding Emunds Staudinger Trench Shoring Systems Krings Trench Shoring Systems Shorco Trench Shoring Systems Other Reference Projects Residential Buildings Public and Civil Buildings Water

    Original URL path: http://www.bepatech.cz/?q=en/node/435 (2016-04-26)
    Open archived version from archive


  • 2011 - VZT Blanka - SO 05 | ULMA Construcción CZ s.r.o.
    centre has got the excavation cross sectional area of 286 m2 In the big hall of Blanka will be located ventilators with operating systems and power supply This way the air from tunnels will be ventilated above the level of land By its parameters height of 15 5 m and planned concrete volume for one phase of each casting segment the realization of this tunnel certainly was not little thing Ulma Construcción CZ prepared the tunnel form by total length of 6 125 m with steel envelope thickness of 5 mm included of hydraulic system of levelling and lowering completed with transmission system of movement Speciality of this solution was the assembly directly in the site where thanks to perfectly prepared prescription of assembly flow the upper truss could be safety lifted up and connected to the bottom part of tunnel form which assures the transmission of load and movement of whole structure The compatibility of this system with other Alpi system allowed equipping the form with safety elements of climbing and pouring concrete accessory The idea of the Meccano construction set allowed operatively equipped tunnel form by next useful constructions in the place of two linking tunnels which by their shapes not to allow pouring coherently the concrete by both side main tunnel form Moreover the reality that was possibility to construct the reinforcement cart of the same profile from the same system which assures the pre step technology of own concreting all this is the mental link of modular system Meccano Go to the list of realized objects of Tunnel Blanka Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600

    Original URL path: http://www.bepatech.cz/?q=en/node/367 (2016-04-26)
    Open archived version from archive

  • 2011 - VZT Blanka - Entries | ULMA Construcción CZ s.r.o.
    single side frames were the height assembled on the lower ones and anchored to the anchors prepared in previous concreting phase Supporting the vault of starting tunnel segment was solved as intermediate made from Ortho system which completes both single side formworks For the optimization were some parts construction supplied pre assembled into tunnel which no doubt led to the increasing the work effectiveness and time savings Gallery Back to list 2 Intersection of tunnel SO 05 with tunnel SO 03 Project technical features Height 15 5 m Number of concreting sections 3 Lenght of tunnel form 6m Execution period 04 2011 06 2011 Contractor METROSTAV a s divize 5 Subject of supply Single side formwork of the face wall tunnel form of starting segment of tunnel SO 03 Utilized system Meccano Omega Project description The same way as on the opposite side were planned three casting phase Again the Meccano single side frames were asserted used the same solution of the face wall as in the case of linking tunnels on the opposite side assembling the Meccano single side trusses on the lower ones and anchoring them to the previous concreting phase But against this the formwork of starting segment was solving already as a tunnel form which with the small modifications was used later for realization of tunnel 03 turn This all optimized whole building process of this part No doubt that a lot of time saving brought also the pre assembling each parts in our warehouse Gallery Back to list 3 Intersection of tunnel SO 05 with tunnel SO 04 Project technical features Height 9 3 m Number of concreting sections 3 Lenght of tunnel form 2m Execution period 06 2011 Contractor METROSTAV a s divize 5 Subject of supply Formwork of starting segment of tunnel SO 04 Utilized system Meccano Omega Project description This intersection with tunnel SO 04 is the one of the side connections with tunnel SO 05 Against the rest ones with SO 07 and SO 08 this intersection differs that it enters into tunnel SO 05 in the lower height level However this intersection also influences the concreting of tunnel SO 05 in this casting phase because it causes the asymmetry pouring of fresh concrete Therefore the tunnel form was locally added by helpful support structures from Meccano system Moreover due to the underneath intersection with tunnel 05 tunnel form in SO 05 was forced to cross the temporary bridge for rails Gallery Back to lilst 4 Intersection of tunnel SO 05 with tunnel SO 07 Project technical features Height 8 m Number of concreting sections 3 Lenght of tunnel form 2m Execution period 06 2011 Contractor METROSTAV a s divize 5 Subject of supply Formwork of starting segment of tunnel SO 07 Utilized system Meccano Popis This intersection with tunnel SO 07 is the one of the side connections with tunnel SO 05 This intersection influences the concreting of tunnel SO 05 in this casting phase because it causes the asymmetry

    Original URL path: http://www.bepatech.cz/?q=en/node/369 (2016-04-26)
    Open archived version from archive

  • 2011 - VZT Blanka - SO 03 | ULMA Construcción CZ s.r.o.
    Blanka SO 03 Project technical features Height 4 37m Lenght 120m Execution period 10 2011 12 2011 Contractor METROSTAV a s divize 5 Subject of supply Tunnel form for the straight part with steel envelope h 4 735m l 6m added by hydraulic system of lifting and lowering tunnel form for the turn with wooden envelope 2x h 4 734 m l 6m Utilized system Meccano Omega steel envelope thickness of 5 mm turn wooden envelope Project description For link up to tunnel starting segment was used tunnel form which was used before for the realization the starting segment with face wall Ulma Construción CZ added next same tunnel form and this combination of same tunnel forms allowed realizing the formwork of the curved section Because of the technology pause in this tunnel later Ulma Construcción CZ supplied a new tunnel form for the straight section with steel envelope and hydraulic lifting and lowering system Go to the list of realized objects of Tunnel Blanka Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel 421 249 102 911 13 E mail info ulmaconstruction sk Branch Office Brno Kulkova 10 615 00 Brno Tel 517 543 411 Fax 517 543 412 e mail info ulma c cz Pobočka Žilina Štrková 10 010 01 Žilina Tel 421 911 721 141 E mail mryba ulmaconstruction sk Branch Office Ostrava U Řeky 594 720 00 Ostrava Hrabová Tel 596 531 252 Fax 596 531 252 e mail info ulma c cz Sklad Plzeň Bezovka 351 Areál Manto 330

    Original URL path: http://www.bepatech.cz/?q=en/node/384 (2016-04-26)
    Open archived version from archive

  • 2011 - VZT Blanka - SO 04 | ULMA Construcción CZ s.r.o.
    l 6 125m Lower cart with wooden envelope h 2 29m l 6m the height adjusted h 5 23m the formwork for twisted middle wall made from Meccano system equipped with wooden stencils Utilized system Meccano Project description The planned concreting was two phases During the first phase were realized a bottom of tunnel Here the lower cart was used equipped with stencils and wooden envelope allows the possibility of height adjusting for the part of higher dilatation joint by transition to the small profile Subsequently Ulma Construcción CZ delivered for both profiles small and big two tunnel forms length of 6 125m with steel envelope Later after both tunnel realizations started the realization of twisted middle wall The specific part of this wall was the section length of 18m where the wall was twisted from vertical to horizontal position with constant 5 on 1 m The concreting of this wall was divided into three phases length by 6m The formwork was divided into 2 parts formwork grids from Meccano system and the support structure on request from separable elements from Ortho system The formwork grids were designed from systems Meccano Omega Grids were completed with the wooden stencils designed exactly from 3D model cross sections Thanks to chosen composition the final transition of twisted wall was smooth along its length without any edges or offsets which contributes to good aesthetic appearance of this construction part Go to the list of realized objects of Tunnel Blanka Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel

    Original URL path: http://www.bepatech.cz/?q=en/node/382 (2016-04-26)
    Open archived version from archive

  • 2011 - VZT Blanka - SO 07 | ULMA Construcción CZ s.r.o.
    of supply Mobile wall formwork h 8m l 6 125m compound of two mobile forms Utilized system Meccano Omega wooden envelope Project descritpion For the realization of ventilation tunnels there is need to build the additional construction in this case the wall in the middle which divides the tunnel into two parts where in the future will flow by one side fresh air into main automobile tunnels and by second side exhaust fumes out of them Ulma Construcción CZ supplied to a customer mobile wall formwork compound of two mobile formworks length of 3m so it could be realized the section where the middle wall copied the direction of tunnel axis curving into entry with engineering ventilation centre The specific thing of this mobile formwork was its equipment with hydraulic system of tilt system including the compression adjustable spindles which contributes the striking of this 8m high formwork The customer request was to deliver the formwork resistable the fresh concrete pressure of 100 kN m2 this was allowed thanks to modular system Meccano system which allows construct the strong customized formwork by changing its elements configuration Go to the list of realized objects of Tunnel Blanka Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel 421 249 102 911 13 E mail info ulmaconstruction sk Branch Office Brno Kulkova 10 615 00 Brno Tel 517 543 411 Fax 517 543 412 e mail info ulma c cz Pobočka Žilina Štrková 10 010 01 Žilina Tel 421 911 721 141 E mail mryba ulmaconstruction sk

    Original URL path: http://www.bepatech.cz/?q=en/node/361 (2016-04-26)
    Open archived version from archive

  • 2011 - tunnel Strahov 3L | ULMA Construcción CZ s.r.o.
    tunnel OSEK 2009 tunnels Dobrovského 2007 subway Benešov 2004 subway Chrastava 2004 tunnel Panenská 2003 tunnel Kobylisy 2003 tunnel Mrázovka TP3 2002 Mrázovka Special Constructions Scaffolding Trench Shoring Systems Other Service Company ULMA CZ Profile History ULMA Construcción SP ALPI s p a IT Contacts Ulma Construcción CZ Contacts ULMA Contrucción worldwide Demand form Home Reference Projects Tunnels 2011 tunnel Strahov 3L 2011 tunnel Strahov 3L Project name Strahov tunnel 2 building part B excavated tunnel 3 lane Execution period 2011 2012 Main contractor EUROVIA a s Contractor Metrostav a s divize 5 Utilized ULMA products MECCANO and OMEGA systems Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel 421 249 102 911 13 E mail info ulmaconstruction sk Branch Office Brno Kulkova 10 615 00 Brno Tel 517 543 411 Fax 517 543 412 e mail info ulma c cz Pobočka Žilina Štrková 10 010 01 Žilina Tel 421 911 721 141 E mail mryba ulmaconstruction sk Branch Office Ostrava U Řeky 594 720 00 Ostrava Hrabová Tel 596 531 252 Fax 596 531 252 e mail info ulma c cz Sklad Plzeň Bezovka 351 Areál Manto 330 03 Chrást u Plzně Tel 702 006 019 773 576 507 E mail info ulmaconstruction cz Home Systems and Products Wall Formworks Column Formworks Slab Formworks Propping and Shoring Systems Support Systems Special Support and Formwork System Complementary Items for Formworks Scaffolding Emunds Staudinger Trench Shoring Systems Krings Trench Shoring Systems Shorco Trench Shoring Systems Other Reference Projects Residential Buildings Public and Civil Buildings Water

    Original URL path: http://www.bepatech.cz/?q=en/node/348 (2016-04-26)
    Open archived version from archive

  • 2010 - tunnel Blanka | ULMA Construcción CZ s.r.o.
    tunnels Dobrovského 2007 subway Benešov 2004 subway Chrastava 2004 tunnel Panenská 2003 tunnel Kobylisy 2003 tunnel Mrázovka TP3 2002 Mrázovka Special Constructions Scaffolding Trench Shoring Systems Other Service Company ULMA CZ Profile History ULMA Construcción SP ALPI s p a IT Contacts Ulma Construcción CZ Contacts ULMA Contrucción worldwide Demand form Home Reference Projects Tunnels 2010 tunnel Blanka 2010 tunnel Blanka Project name SO 9021 01e northern tunnel tube STT třípruh úsek km 5 038 5 270 Execution period 2010 2011 Main contractor METROSTAV a s Contractor SMP CZ a s Utilized ULMA products MINIPLUS and MIDI panel systems MECCANO and OMEGA systems Galerie Reference Projects Residential Buildings Public and Civil Buildings Water and industrial buildings Bridges Tunnels Special Constructions Scaffolding Trench Shoring Systems Other HQ Benátky nad Jizerou Průmyslová 1009 294 71 Benátky nad Jizerou Tel 326 910 600 Fax 326 910 601 e mail info ulma c cz Centrála Bratislava Bojnická 20 834 04 Bratislava Tel 421 249 102 911 13 E mail info ulmaconstruction sk Branch Office Brno Kulkova 10 615 00 Brno Tel 517 543 411 Fax 517 543 412 e mail info ulma c cz Pobočka Žilina Štrková 10 010 01 Žilina Tel 421 911 721 141 E mail mryba ulmaconstruction sk Branch Office Ostrava U Řeky 594 720 00 Ostrava Hrabová Tel 596 531 252 Fax 596 531 252 e mail info ulma c cz Sklad Plzeň Bezovka 351 Areál Manto 330 03 Chrást u Plzně Tel 702 006 019 773 576 507 E mail info ulmaconstruction cz Home Systems and Products Wall Formworks Column Formworks Slab Formworks Propping and Shoring Systems Support Systems Special Support and Formwork System Complementary Items for Formworks Scaffolding Emunds Staudinger Trench Shoring Systems Krings Trench Shoring Systems Shorco Trench Shoring Systems Other Reference Projects Residential Buildings Public and

    Original URL path: http://www.bepatech.cz/?q=en/node/347 (2016-04-26)
    Open archived version from archive